Following a recent structural inspection of Jubilee Bridge (Tay Crossing), a defect has been identified in a steel bracing member located beneath the bridge deck. An initial assessment has been undertaken by specialist structural engineers, and temporary traffic management measures are being introduced as a precaution while further detailed investigations are undertaken.
Traffic will be controlled by temporary traffic signals within a single lane, centrally positioned over the bridge deck from Tuesday 10 November. This arrangement is designed to minimise structural loading while detailed assessments are concluded and any necessary repair works are planned and completed.
The bridge remains safe for public use, and there is no indication of any immediate risk to public safety. Detailed assessments and repair planning are being progressed as a priority, and further updates will be provided as information becomes available.